Sign In | Join Free | My carsrow.com
China China CT Steelstructure Co.,Ltd logo
China CT Steelstructure Co.,Ltd
China CT Steelstructure Co.,Ltd
Verified Supplier

1 Years

Home > Steel Structure Warehouse >

Carbon Fast Assemble Steel Structure Metal Frame Warehouse Building

China CT Steelstructure Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Carbon Fast Assemble Steel Structure Metal Frame Warehouse Building

  • 1
  • 2
  • 3

Brand Name : China CT

Model Number : Steel Structure Warehouse

Certification : ISO CE

Place of Origin : China

MOQ : 500M²

Price : USD 30-250 / M²

Payment Terms : T/T, L/C

Supply Ability : 200,000 Tons / Year

Delivery Time : 20-40 Days

Packaging Details : Standard Packing

Surface : Painted/Galvanized

Connect : Bolt/Weld

Raw Steel Material : Q235B, Q355B, ASTM A36

Country Of Origin : China

Roof Cladding : Corrugated Steel Sheet/Sandwich Panel

Roofing : Sandwich Panel, Single Steel Sheet

Main Structure : Low Carbon Steel Q235 Q345

Purlins And Girts : Cold rolled C or Z steel, Q355 or Q235

Imodel Number : steel structure

Certifications : ISO 9001, CE

Doors : Sliding/roller door

Multi Story : how many floors/with mezzanine

Contact Now

Fast Assemble Steel Structure Metal Frame Warehouse Building

Quick Assembly: The fast assemble design allows for rapid on-site construction, significantly reducing project timelines and labor costs.
High Strength: The metal frame is made from high-strength steel, ensuring robust load-bearing capacity and long-term durability.
Modular Design: The warehouse building features a modular structure, offering flexibility in size and layout to accommodate various storage needs.
Cost-Effective: Prefabricated components and efficient assembly processes make it an economical solution for large-scale warehousing.
Resilience: The steel structure is highly resistant to environmental factors such as corrosion, fire, and seismic activity, ensuring safety and longevity.
Carbon Fast Assemble Steel Structure Metal Frame Warehouse Building
Carbon Fast Assemble Steel Structure Metal Frame Warehouse Building

FAQ
1. You are manufacturer or trading company?
We are a manufacturer. And welcome to visit us at any time. The quality control flow and sales team will show you
our professionalism. Also you will can get best and most competitive price after visiting us.

2. Is your price competitive compared with other companies?
Our business objectives are to give the best price with best quality. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.

3. Can you send engineers or whole team to install my project?
We will give detailed installation drawings for free. We can send engineers as installation director or a team upon request.

4. Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container loading, but any time during the production time.

5. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. we can design complex industrial building like office mansion, supermarket, auto dealer shop, shipping mall, 5 star hotel.

6. What is the delivery time?
Delivery time depends on order quantities. In general the delivery time to nearest seaport in China will be 40 days after
receiving deposit.


Product Tags:

Carbon Metal Frame Warehouse Building

      

Carbon Steel Structure Frame Warehouse

      

Fast Assemble Warehouse

      
 Carbon Fast Assemble Steel Structure Metal Frame Warehouse Building Manufactures

Carbon Fast Assemble Steel Structure Metal Frame Warehouse Building Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: China CT Steelstructure Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)